Deploy It
Milestone 9 of 9 in Build Your First App.
A Zerotal app is a Bun process: install, set the environment, migrate, build the
frontend, start the server, and start a worker for the queue. bun zt deploy:<env> runs
the release part of that and refuses to finish when something is wrong.
Deployment is the full guide, including proxies, Docker and a single
compiled binary. This milestone rehearses a release on your own machine, so you see
every refusal before a server does.
See the plan
# in your project root
APP_ENV=production bun zt deploy:production --dry-run
Deploy → production
APP_ENV production
preflight config validators, then doctor checks
step assets:build
step inertia:build
step migrate
verify doctor checks again
Dry run — no steps executed. (The app was booted to resolve them.)
production and staging exist by default; config/deploy.ts adds more. The command
runs where the app runs, with that environment's variables. It does not reach a server
over SSH.
Run the gate
--check runs only the preflight: everything that can refuse, and nothing that builds,
migrates or restarts. Rehearse with a separate database, so your development data is
not touched:
# in your project root
APP_ENV=production DATABASE_URL=./database/production.sqlite bun zt deploy:production --check
It refuses. Most lines are warnings, marked !; one is a failure, marked ✗, and that
is enough to stop the release:
✗ Transport origins — app.url is http://localhost:3000 in a production environment, so allowedOrigins is a loopback address. Browsers send the public origin, which is not in the list — every credentialed action will be refused.
fix: Set APP_URL to the public URL the site is served from.
✖ 1 check(s) failed at preflight. Nothing further has run — fix these and deploy again.
The production environment
Each refusal names a variable to set. In production these are your platform's secrets,
not a committed file. For the rehearsal, put them in .env.production. The starter's
.gitignore and .dockerignore already keep every .env.* file except .env.example out
of the repository and the image, so this one stays on your machine:
# .env.production
APP_ENV=production
APP_URL=https://tasks.example.com
APP_SECURE=true
DATABASE_URL=./database/production.sqlite
HEALTH_KEY=rehearsal-health-key
MAIL_DRIVER=smtp
MAIL_FROM_ADDRESS=hello@tasks.example.com
SMTP_HOST=smtp.example.com
SMTP_USERNAME=apikey
SMTP_PASSWORD=not-a-real-password
What each one is for:
-
APP_URL— the public origin. Requests that change data are checked against it. -
APP_SECURE— the starter's switch forStrict-Transport-Security, for a site served over HTTPS. The gate fetchesAPP_URLand refuses when nothing sends it. -
MAIL_DRIVER— this app sends real mail: verification links, password resets and the task notifications. With a realMAIL_FROM_ADDRESSand the driver stilllog, the gate refuses: every message would go to a log file. -
HEALTH_KEY—/healthanswers load balancers in production only when they send it. -
APP_KEY— already in.envfrom the scaffolder. Production needs a separate one, kept secret. Don't runbun zt key:generatefor it here: that writes into this project's.envand replaces your development key. Print a new one instead and put it in your platform's secrets (or, for the rehearsal, addAPP_KEY=with it to.env.production):# anywhere bun -e "console.log(Buffer.from(crypto.getRandomValues(new Uint8Array(32))).toString('base64'))"
Environment lists the rest.
Load the file into your shell and run the gate again. This uses a POSIX shell (bash or zsh; on Windows, Git Bash or WSL):
# in your project root
set -a; . ./.env.production; set +a
bun zt deploy:production --check
✓ 23 checks passed, 1 warning(s)
The warning left is that the eight migrations have not run on the new database. The release runs them.
Release
# in your project root, with .env.production loaded
bun zt deploy:production
It runs the gate, then assets:build and inertia:build, then the eight migrations
against the new database, then checks again:
migrate
Migrated 8 migration(s).
0001_create_users_table ran
0002_create_password_reset_tokens_table ran
0003_create_user_sessions_table ran
0004_create_passkeys_table ran
0005_create_social_accounts_table ran
0006_create_projects_table ran
0007_create_tasks_table ran
0008_add_tenant_id_columns ran
Verify
✓ 23 checks passed
production release complete. Restart the service to pick it up.
It does not start or restart anything. Your process supervisor does that, after the command exits 0.
Run it
Two long-running processes: the server, and a worker for the queued notifications.
# in your project root, with .env.production loaded
PORT=3001 bun zt serve
# in your project root, with .env.production loaded, in a second terminal
bun zt worker
Starting Zerotal worker...
INFO [QUEUE] Polling [default, notifications] every 500ms
Without the worker, every task notification waits in the queue and nobody is told.
Start the server covers supervisors, and the
starter's Dockerfile is a starting point for a container.
Check it
# in your project root
curl "http://localhost:3001/health?key=rehearsal-health-key"
{"status":"ok"}
Without ?key= it answers 401. curl -sI http://localhost:3001/ shows the
Strict-Transport-Security header. And doctor reads the running site from outside,
which is the one check the gate cannot make before the release is live:
# in your project root, with .env.production loaded
bun zt doctor --url=http://localhost:3001
All 23 checks passed.
Against a real deployment, point --url at the public address: it then also sees what
the proxy in front of the app adds or drops.
The production checklist
The production checklist is what
deploy:production checks or does, and what it cannot. For this app:
| Checklist item | Done by |
|---|---|
APP_ENV=production | .env.production; the gate's first check |
A strong APP_KEY | A new random key, kept as a secret, not the dev one |
APP_URL | .env.production; the gate refused without it |
DATABASE_URL | .env.production |
| Secure headers | APP_SECURE=true |
| CORS origins | The starter's default: same origin only |
| Migrations | deploy:production |
| Frontend build | deploy:production |
| Server and worker | bun zt serve and bun zt worker, under your supervisor |
| Probe the live site | bun zt doctor --url=… |
Back up the database before the first real release: see Back up the database.
Where to go next
You have built a feature the way the rest of an app is built: a model and migration, routes and pages, validation, a policy, background work, tests that include the refusals, and teams. What Ships lists what the framework already does — roles, audit logs, uploads, scheduled jobs, an admin panel — so check it before you build the next thing.